Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Yarra River Catchment
ME_YFM980
Site visits
16-04-2020
Five Mile Creek, end of Governors Road, Essendon
Melbourne
DOWNLOAD DATA
ME_YFM980 Yarra River Catchment
Thursday 16th April 2020 11:15am
Approved
Notes
Physical Chemical Tests
Ammonium
0.08
mg/L NH4+
Dissolved Oxygen % Saturation
63.23
%
Dissolved Oxygen mg/L
6
mg/L
Electrical Conductivity
570
µS/cm
pH
7.3
pH Units
Reactive Phosphate (mg/L)
0.5
mg/L P
Temperature - AIR
19.3
° C
Temperature - WATER
17.8
° C
Turbidity - NTU
24
NTU
Water Conditions
Weather
Sunny
Last rainfall
More than a week ago
Flow estimate
LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Clear
Stream depth
0 - 50cm
Stream width
2m - 5m
Hazards
Litter/Pollutants
bottles,plastic,packets,polystyrene,other: timber
Diary photos
Physical Chemical Trends
Loading chart
Test 1
Ammonium
Dissolved Oxygen mg/L
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Ammonium
Dissolved Oxygen mg/L
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
15-02-2020
16-04-2020
20-05-2023
→
Modal title