Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Yarra River Catchment
ME_YFM980
Site visits
20-05-2023
Five Mile Creek, end of Governors Road, Essendon
Melbourne
DOWNLOAD DATA
ME_YFM980 Yarra River Catchment
Saturday 20th May 2023 13:30pm
Approved
Notes
Physical Chemical Tests
Ammonium
0
mg/L NH4+
Dissolved Oxygen % Saturation
99.02
%
Dissolved Oxygen mg/L
10
mg/L
Electrical Conductivity
204
µS/cm
pH
7.3
pH Units
Reactive Phosphate (mg/L)
0.08
mg/L P
Temperature - AIR
15.8
° C
Temperature - WATER
14.9
° C
Turbidity - NTU
14
NTU
Water Conditions
Weather
Cloudy
Last rainfall
During the last 24 hours
Flow estimate
MEDIUM: flow is normal/typical average flow
Water Appearance
Stream depth
0 - 50cm
Stream width
< 2m
Hazards
Litter/Pollutants
paper,plastic,polystyrene
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Ammonium
Dissolved Oxygen mg/L
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Ammonium
Dissolved Oxygen mg/L
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
16-04-2020
20-05-2023
→
Modal title