Last rainfall
During the last 24 hours 0.00
Flow estimate
FLOOD / OVERBANK: flow is high and water level has exceeded bank capacity and is connecting with floodplain
Stream depth
Other:400-500cm
Hazards
Creek in flood (muddy)
Litter/Pollutants
plastic,other: One plastic spoon