Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Bunyip River Catchment
ME_EBI200
Site visits
03-03-2021
Bittern catch drain, 20m above Devilbend Creek
Melbourne
DOWNLOAD DATA
ME_EBI200 Bunyip River Catchment
Wednesday 3rd March 2021 11:33am
Approved
Notes
Physical Chemical Tests
Ammonium
0
mg/L NH4+
Dissolved Oxygen % Saturation
87.02
%
Dissolved Oxygen mg/L
8
mg/L
Electrical Conductivity
3500
µS/cm
pH
8.5
pH Units
Reactive Phosphate (mg/L)
0
mg/L P
Temperature - AIR
24
° C
Temperature - WATER
18.9
° C
Turbidity - NTU
19
NTU
Water Conditions
Weather
Sunny
Last rainfall
During the last week
5.00
Flow estimate
LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Stained brown,Muddy
Stream depth
51cm - 99cm
Stream width
2m - 5m
Hazards
slippery banks and muddy
Litter/Pollutants
Diary photos
Physical Chemical Trends
Loading chart
Test 1
Ammonium
Dissolved Oxygen mg/L
Nitrate - Nitrogen
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Ammonium
Dissolved Oxygen mg/L
Nitrate - Nitrogen
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
23-02-2021
03-03-2021
17-05-2021
→
Modal title