Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Bunyip River Catchment
ME_EBI200
Site visits
17-05-2021
Bittern catch drain, 20m above Devilbend Creek
Melbourne
DOWNLOAD DATA
ME_EBI200 Bunyip River Catchment
Monday 17th May 2021 9:34am
Approved
Notes
Physical Chemical Tests
Ammonium
0
mg/L NH4+
Dissolved Oxygen % Saturation
56.04
%
Dissolved Oxygen mg/L
6
mg/L
Electrical Conductivity
4000
µS/cm
pH
8.9
pH Units
Reactive Phosphate (mg/L)
0
mg/L P
Temperature - AIR
15
° C
Temperature - WATER
11.7
° C
Turbidity - NTU
150
NTU
Water Conditions
Weather
Cloudy
Last rainfall
During the last 24 hours
3.00
Flow estimate
LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Stained brown,Muddy
Stream depth
0 - 50cm
Stream width
2m - 5m
Hazards
slippery banks and muddy
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Ammonium
Dissolved Oxygen mg/L
Nitrate - Nitrogen
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Ammonium
Dissolved Oxygen mg/L
Nitrate - Nitrogen
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
03-03-2021
17-05-2021
22-06-2021
→
Modal title