Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Campaspe River Catchment
NC_SHE950
Site visits
02-10-2022
Shepherds Hut Creek, Shepherds Hill Road, Lauriston
North Central
DOWNLOAD DATA
NC_SHE950 Campaspe River Catchment
Sunday 2nd October 2022 11:00am
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
164
µS/cm
pH
7.1
pH Units
Reactive Phosphate (mg/L)
0.05
mg/L P
Temperature - AIR
16.9
° C
Temperature - WATER
14.5
° C
Turbidity - NTU
9
NTU
Water Conditions
Weather
Sunny
Last rainfall
During the last week
Flow estimate
HIGH: Less than bankfull and in-stream habitats connected
Water Appearance
Foamy/frothy,Stained brown
Stream depth
51cm - 99cm
Stream width
< 2m
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Test 2
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
07-08-2022
02-10-2022
07-01-2023
→
Modal title