Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Yarra River Catchment
ME_YED810
Site visits
30-09-2025
Edgars Creek catchment, Gilwell Road constructed wetlands, west of Edgars Road, Epping
Melbourne
DOWNLOAD DATA
ME_YED810 Yarra River Catchment
Tuesday 30th September 2025 12:19pm
Approved
Notes
Physical Chemical Tests
Dissolved Oxygen % Saturation
95
%
Electrical Conductivity
149
µS/cm
pH
6.6
pH Units
Temperature - AIR
19
° C
Temperature - WATER
17.1
° C
Turbidity - NTU
10.5
NTU
Water Conditions
Weather
Windy
Last rainfall
During the last 24 hours
3.00
Flow estimate
Water Appearance
Foamy/frothy,Stained brown
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
06-03-2025
30-09-2025
→
Modal title