Skip to content
 
WaterWatch Data Portal

Edgars Creek catchment, Gilwell Road constructed wetlands, west of Edgars Road, Epping ME_YED810

Melbourne Yarra River Yarra River Edgars Creek

Site Visit
19-03-2026
Approved
Physical Chemical
N mg/L NH4+ Water ° C Air ° C pH pH Units EC µS/cm rP mg/L P D.O. % Turb NTU
0.08 18.8 20 7.5 135 0.09 8.8 9.5
30-09-2025
Approved
Physical Chemical
N mg/L NH4+ Water ° C Air ° C pH pH Units EC µS/cm rP mg/L P D.O. % Turb NTU
17.1 19 6.6 149 95 10.5
06-03-2025
Approved
Physical Chemical
N mg/L NH4+ Water ° C Air ° C pH pH Units EC µS/cm rP mg/L P D.O. % Turb NTU
21.3
17-12-2024
Approved
Physical Chemical
N mg/L NH4+ Water ° C Air ° C pH pH Units EC µS/cm rP mg/L P D.O. % Turb NTU
20.6 28 6.7 122 10 82
07-11-2024
Approved
Physical Chemical
N mg/L NH4+ Water ° C Air ° C pH pH Units EC µS/cm rP mg/L P D.O. % Turb NTU
20