Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Mallee Catchment
MA_PFO600
Site visits
09-06-2012
Foster Street Settling pond rehabilitation site 2
Mallee
DOWNLOAD DATA
MA_PFO600 Mallee Catchment
Saturday 9th June 2012 10:00am
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
480
µS/cm
pH
7.3
pH Units
Reactive Phosphate (mg/L)
0.4
mg/L P
Temperature - WATER
11.9
° C
Turbidity - NTU
35
NTU
Water Conditions
Weather
Last rainfall
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Test 2
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
06-05-2012
09-06-2012
15-07-2012
→
Modal title