Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Mallee Catchment
MA_PFO600
Site visits
15-07-2012
Foster Street Settling pond rehabilitation site 2
Mallee
DOWNLOAD DATA
MA_PFO600 Mallee Catchment
Sunday 15th July 2012 11:30am
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
288
µS/cm
pH
6.9
pH Units
Reactive Phosphate (mg/L)
0.6
mg/L P
Temperature - WATER
12.3
° C
Turbidity - NTU
50
NTU
Water Conditions
Weather
Last rainfall
Flow estimate
Water Appearance
Smelly,Foamy/frothy
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Test 2
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
09-06-2012
15-07-2012
12-08-2012
→
Modal title