Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Snowy River Catchment
EG_BRO065
Site visits
31-01-2013
Brodribb River 'Camp Ground Bridge
East Gippsland
DOWNLOAD DATA
EG_BRO065 Snowy River Catchment
Thursday 31st January 2013 9:00am
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
68.1
µS/cm
pH
5.66
pH Units
Reactive Phosphate (mg/L)
0.02
mg/L P
Temperature - AIR
17.2
° C
Temperature - WATER
16.5
° C
Turbidity - NTU
0
NTU
Water Conditions
Weather
Sunny
Last rainfall
During the last week
Flow estimate
HIGH: Less than bankfull and in-stream habitats connected
Water Appearance
Clear
Stream depth
1m - 2m
Stream width
2m - 5m
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Test 2
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
06-12-2012
31-01-2013
28-02-2013
→
Modal title