Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Bunyip River Catchment
ME_ETO300
Site visits
15-09-2014
Toomuc Creek opposite the performing arts centre at Beaconhills College
Melbourne
DOWNLOAD DATA
ME_ETO300 Bunyip River Catchment
Monday 15th September 2014 3:30am
Approved
Notes
Physical Chemical Tests
Dissolved Oxygen mg/L
0.05
mg/L
Electrical Conductivity
410
µS/cm
pH
7.6
pH Units
Reactive Phosphate (mg/L)
0.04
mg/L P
Temperature - AIR
17
° C
Temperature - WATER
14
° C
Turbidity - NTU
17
NTU
Water Conditions
Weather
Cloudy
Last rainfall
During the last 24 hours
1
Flow estimate
HIGH: Less than bankfull and in-stream habitats connected
Water Appearance
Stained brown
Stream depth
0 - 50cm
Stream width
2m - 5m
Hazards
Litter/Pollutants
plastic,polystyrene,other
Habitat
Bank Erosion Stability
Bank Vegetation
In Stream Cover
Riffles Pools Bends
Verge Vegetation
Overall
Fair
3
Good
8
Good
8
Good
4
Good
8
Good
31
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Dissolved Oxygen mg/L
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Dissolved Oxygen mg/L
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
18-08-2014
15-09-2014
01-12-2014
→
Modal title